§ 13-95. Walls, ceilings, partitions, and posts.
(a)
Walls, partitions, posts, ceilings and exposed overhead structures of all rooms and areas shall be kept clean and in good repair.
(b)
Those sections of walls, partitions, posts, ceilings and exposed overhead structures in processing areas which become soiled during processing shall be thoroughly cleaned at least once in each 24-hour period.
(c)
Walls, partitions and posts in all processing areas shall be finished with smooth, washable, surfaces of concrete, cement-plaster, or other equally impervious and easily cleanable material.
(d)
Interior walls separating one room or area from another shall extend from the floor to the ceiling. Such walls shall be free from openings except for necessary doorways equipped with tight fitting self-closing completely metal clad doors, and necessary openings for conveyors.
(e)
All outer walls and roofs and openings therein shall be protected against the entrance and harborage of rodents, and insects.
(Ord. No. 2008-05-15-0402, § 1(Att. I), 5-15-08)