§ 29-145. Cleanup of right-of-way.  


Latest version.
  • In every case and at all times, the work of removing from the right-of-way all obstructions, surplus materials, debris and waste matter of every description caused by and accumulated from the excavation shall be the responsibility of the ROW user. Streets shall be cleaned by use of a regenerative air or vacuum street sweeper. The ROW user shall clean the surrounding area, as outlined above, within one (1) day upon completion and approval of all trench work and pavement restoration unless the director, sufficient reason therefor having been given to his satisfaction, grants an extension of time.

(Ord. No. 93319, § 1, 1-25-01)