§ 29-161. Removal and reconstruction where work defective.  


Latest version.
  • All construction work in the streets, right-of-way, sidewalks and public places of the city is declared to be subject to the exclusive control of the city, and whenever, in the opinion of the director, any such work shall not have been duly completed within a reasonable time or shall have been executed in a defective manner, whether because of bad workmanship or materials or because not true to the lines or grades or specifications therefor given to him by the director, then upon written demand or notice from the director, such ROW user or contractor shall promptly remedy, complete or remove and reconstruct such incomplete or defective work all as the director may require, and these provisions shall also apply to all repair and maintenance work. If the contractor or ROW user shall fail or refuse to do so within a reasonable time to be specified by the director, then, if the director shall so order, such work shall be completed or corrected or removed and wholly or partially reconstructed by the city, in such manner as in the opinion of the director may be necessary to make such work as good as originally required, and such work may be done by contract or otherwise, under the direction of the director.

(Ord. No. 93319, § 1, 1-25-01)