§ 34-121.1. Pass-through of EAA permit fee.  


Latest version.
  • The assessment of a pass-through of the Edwards Aquifer Authority ("EAA") permit fee to all water customers is authorized. The initial monthly pass-through of the EAA permit fee shall commence on or after January 1, 1998, and shall apply to all water customers and all types of water usage. Such initial pass-through, while estimated to be $0.00629 per hundred gallons of consumption, is subject to change, based on the formula set out herein. The San Antonio Water System is delegated the authority to administratively adjust such pass-through on an annual basis, on or about January 1 of each year, in accordance with the following formula:

    EDWARDS AQUIFER AUTHORITY ("EAA")
    PERMIT FEE ADJUSTMENT

    An adjustment will be made to the Edwards Aquifer Authority Permit Fee annually, beginning January 1, 1998, based on the following formula: the annual permit fee billed by the Edwards Aquifer Authority for the twelve-month period beginning in January plus the amount of the over-recovery or under-recovery from the prior twelve-month permit fee collections, divided by the project annual water usage, yields the permit fee on a dollars-per-gallon basis.

    Permit fee billed by EAA PLUS Over-recovery/under-recovery from prior 12-month permit fee collections Adjusted permit fee on a dollars-per-gallon basis of consumption, for the 12-month period beginning in the month of January
    _____ =
    Project annual water usage

     

    The San Antonio Water System is directed to show such pass-through as a line item on each customer bill. No pass-through shall be charged if there is not metered use by the customer during the month.

(Ord. No. 87042, § 2, 12-1-97)