San Antonio |
Unified Development Code |
Appendix H. STORM WATER DESIGN CRITERIA MANUAL |
Chapter 13. STORAGE FACILITIES |
Appendix 13.1. Introduction |
Appendix 13.1.1. Security, Access, and Safety Considerations |
§ 13.1.1.1. Security |
§ 13.1.1.2. Access |
§ 13.1.1.3. Safety |
§ 13.2. Sink Holes |
Appendix 13.3. Detention Basins |
§ 13.3.1. Design types |
Appendix 13.3.2. Design Guidelines |
§ 13.3.2.1. Location |
§ 13.3.2.2. Design Frequencies |
§ 13.3.2.3. Features |
§ 13.3.2.4. Routing Methods |
§ 13.3.2.5. Freeboard |
§ 13.3.2.6. Layouts |
§ 13.3.2.7. Overflow |
§ 13.3.2.8. Auxiliary/Emergency Spillways |
Appendix 13.4. Retention Basins |
Appendix 13.4.1. Design Guidelines |
§ 13.4.1.1. Design Frequencies |
§ 13.4.1.2. Routing Methods |
§ 13.4.1.3. Freeboard |
§ 13.4.1.4. Overflow |
§ 13.5. Downstream Flow Analysis |
Appendix 13.6. Structures |
Appendix 13.6.1. Dams |
§ 13.6.1.1. Existing Dam |
§ 13.6.1.2. Proposed Dam |
§ 13.6.1.3. Breach Analysis |
§ 13.6.1.4. Emergency Action Plan |
§ 13.6.1.5. Approval of TCEQ Dam Safety Program |
§ 13.6.2. Inflow Structure |
Appendix 13.6.3. Outfall Structure |
§ 13.6.3.1. Primary Spillway |
§ 13.6.3.2. Secondary Spillway (Auxiliary Spillway) |
Appendix 13.6.4. Pumps |
§ 13.6.4.1. Condition 1 |
§ 13.6.4.2. Condition 2 |
§ 13.6.4.3. Condition 3 |
§ 13.6.4.4. Condition 4 |
§ 13.6.4.5. Condition 5 |
Appendix 13.7. Maintenance Considerations |
§ 13.7.1. Operation |
Appendix 13.7.2. Maintenance Schedule |
§ 13.7.2.1. Regional Detention Facilities |
§ 13.7.2.2. On-Site Storm Water Management Features |
Appendix 13.8. Certification |
§ 13.8.1. Detention Pond Plan Conformance Form |
§ 13.8.2. As-Built Plans for Dams |
Appendix 13.9. References |
§ 13.9.1. Reference Citation |
§ 13.9.2. References |