§ 4.3.1B. RSWMP Participation
All developers shall participate in the RSWMP in one (1) of three (3) ways:
1.
Payment of a fee in lieu of on-site detention (except in areas designated by the Director of TCI as "mandatory detention areas"). The fee schedule is included in UDC Appendix "C," section 35C-109.
2.
Construction of on-site or off-site measures (typically storm water detention facilities) to mitigate increases in runoff resulting from the proposed development.
3.
Construction or participation in the construction of an off-site RSWF to mitigate increased storm water runoff anticipated from ultimate development of the watershed.