San Antonio |
Unified Development Code |
Appendix H. STORM WATER DESIGN CRITERIA MANUAL |
Chapter 4. PLANNING |
Appendix 4.3. Regional Storm Water Management Program (RSWMP) |
§ 4.3.7. New Development
Latest version.
Peak storm water runoff rates from all new development shall be less than or equal to the peak runoff rates from the site's predevelopment conditions for the five (5), twenty-five (25), and one hundred (100) year design storm events, except as provided in section 4.3.1 above.