San Antonio |
Unified Development Code |
Appendix H. STORM WATER DESIGN CRITERIA MANUAL |
Chapter 13. STORAGE FACILITIES |
Appendix 13.6. Structures |
Appendix 13.6.1. Dams |
§ 13.6.1.1. Existing Dam |
§ 13.6.1.2. Proposed Dam |
§ 13.6.1.3. Breach Analysis |
§ 13.6.1.4. Emergency Action Plan |
§ 13.6.1.5. Approval of TCEQ Dam Safety Program |
All hydrology and hydraulic properties of a dam will be reviewed by the TCI Department with regard to spillway design, freeboard hydraulics, backwater curves, and downstream effects due to the dam site. |